An architect is tasked with designing a new VMware Cloud Foundation environment. The company will purchase vSAN Ready Nodes for the management cluster but wants to make use of existing investments…

The correct answer is A. The use of an existing storage array. D. The management domain must be contained within one rack. See the full explanation below for the reasoning.

Question

An architect is tasked with designing a new VMware Cloud Foundation environment. The company will purchase vSAN Ready Nodes for the management cluster but wants to make use of existing investments where possible, including a significant investment made recently in an all-flash storage array and 16GB FC fabric. The design must include this array wherever possible. The company wishes to reuse existing ToR switching that will provide four 10GPs Ethernet connection to each host and one 1Gbps out of band connection. The network will be a standard spine and leaf topology with no layer-2 shared between racks of infrastructure. The ToR switches are each connected to 4 spine switches, with one 10Gbps connection. The clusters must be spread across at- least four racks to ensure maximum resiliency. Which two constraints impact this design? (Choose two )

Options

  • AThe use of an existing storage array.
  • BVMFS does not support FC SAN with VMware Cloud Foundation
  • CMore than one availability design is needed.
  • DThe management domain must be contained within one rack.
  • EA spine and leaf topology is used.

How the community answered

(67 responses)
  • A
    78% (52)
  • B
    13% (9)
  • C
    3% (2)
  • E
    6% (4)