An existing vSAN customer is considering vSAN File Services, and based on the current state analysis, the following information was provided: - 7 vSAN ROBO clusters - The clusters have two hardware…

The correct answer is A. Scale the vSAN clusters to 4 nodes at minimum. B. Upgrade BoM-01 CPU to have 6 cores minimum. See the full explanation below for the reasoning.

Question

An existing vSAN customer is considering vSAN File Services, and based on the current state analysis, the following information was provided:

  • 7 vSAN ROBO clusters
  • The clusters have two hardware BoM (Bill of Materials):

o BoM-01 Test & Dev Environment:

  • 4 CPUs @ 2.50 GHz with 2 cores per CPU.
  • 128 GB Memory.
  • CachingTier 960 GB.
  • CapacityTier 1.8 TB x 4.
  • 10 GigE.

o BoM-02 Production Environment:

  • 4 CPUs @ 2.60 GHz with 6 cores per CPU.
  • 256 GB Memory.
  • CachingTier 960 GB.
  • CapacityTier 6 TB x 4.
  • 10 GigE.

Which two recommendation should the architect propose? (Choose two.)

Options

  • AScale the vSAN clusters to 4 nodes at minimum.
  • BUpgrade BoM-01 CPU to have 6 cores minimum.
  • CScale the vSAN clusters to 3 nodes at minimum.
  • DUpgrade both BoM to have 2 disk groups at minimum.
  • EUpgrade BoM-01 CPU to have 4 cores minimum.

How the community answered

(47 responses)
  • A
    83% (39)
  • C
    11% (5)
  • D
    4% (2)