nerdexam
Nokia

4A0-M02 · Question #47

Based on the information shown in the exhibit, which of the following is the time interval used by the SGW to retransmit a GTP signaling message?

The correct answer is F. Only answers B and D are required. On an Alcatel-Lucent 7750 PGW, which of the following is a mandatory step required to set up a Diameter connection to a PCRF server?

Service Fundamentals

Question

Based on the information shown in the exhibit, which of the following is the time interval used by the SGW to retransmit a GTP signaling message?

Options

  • ACreate a Diameter profile.
  • BCreate a Diameter Peer profile.
  • CAssign the Diameter profile to the Diameter Peer profile
  • DAssign the Diameter Peer profile to the Gx interface.
  • EAll of the above answers are required.
  • FOnly answers B and D are required.

How the community answered

(55 responses)
  • A
    4% (2)
  • B
    16% (9)
  • C
    2% (1)
  • D
    5% (3)
  • E
    2% (1)
  • F
    71% (39)

Explanation

On an Alcatel-Lucent 7750 PGW, which of the following is a mandatory step required to set up a Diameter connection to a PCRF server?

Topics

#GTP signaling#SGW retransmission#Diameter profile#LTE core

Community Discussion

No community discussion yet for this question.

Full 4A0-M02 Practice