4A0-C01 · Question #728
4A0-C01 Question #728: Real Exam Question with Answer & Explanation
Sign in or unlock 4A0-C01 to reveal the answer and full explanation for question #728. The question stem and answer options stay visible for context.
Question
Click the exhibit. E-pipe 100 is using an SDP with an LSP that uses the path shown (PE1-PE2-PE3-PE4). Based on the OAM command output, which of the following is FALSE?
Exhibit
Options
- AThe E-pipe can support a maximum MTU size of 1578.
- BThe ports of the link PE2-PE3 have an MTU of 1578.
- CAn svc-ping of the E-pipe will succeed.
- DIf the step size was 2, the maximum response size would be the same.