nerdexam
Nokia

4A0-104 · Question #91

4A0-104 Question #91: Real Exam Question with Answer & Explanation

Sign in or unlock 4A0-104 to reveal the answer and full explanation for question #91. The question stem and answer options stay visible for context.

Question

Click the exhibit. E-pipe 100 is using an SDP with an LSP that uses the path shown (PE1-PE2-PE3-PE4). Based on the OAM command output, which of the following is FALSE?

Exhibit

4A0-104 question #91 exhibit

Options

  • AThe E-pipe can support a maximum MTU size of 1578.
  • BThe ports of the link PE2-PE3 have an MTU of 1578.
  • CAn svc-ping of the E-pipe will succeed.
  • DIf the step size was 2, the maximum response size would be the same.

Unlock 4A0-104 to see the answer

You've previewed enough free 4A0-104 questions. Unlock 4A0-104 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full 4A0-104 Practice