3V0-32.23 · Question #16
An organization has onboarded a new business unit whose role is to test the applications 5 days prior to the release date. The Service Broker administrator should allow a 2-day extension for these…
The correct answer is A. A maximum lease of 5 days C. A total maximum lease of 7 days. Options A and C are correct because the lease policy must address two distinct requirements: the initial testing window and the maximum allowed lifetime of a deployment. A maximum lease of 5 days (A) caps the initial deployment duration to exactly the testing period needed…
Question
An organization has onboarded a new business unit whose role is to test the applications 5 days prior to the release date. The Service Broker administrator should allow a 2-day extension for these deployments before they are deleted permanently. Which two options must be configured in the lease policy to meet the requirements? (Choose two.)
Options
- AA maximum lease of 5 days
- BA maximum lease of 7 days
- CA total maximum lease of 7 days
- DA total maximum lease of 5 days
- EA grace period of 5 days
How the community answered
(37 responses)- A84% (31)
- B3% (1)
- D3% (1)
- E11% (4)
Explanation
Options A and C are correct because the lease policy must address two distinct requirements: the initial testing window and the maximum allowed lifetime of a deployment. A maximum lease of 5 days (A) caps the initial deployment duration to exactly the testing period needed before release. A total maximum lease of 7 days (C) then permits the 2-day extension the admin wants to grant (5 + 2 = 7), while still enforcing a hard ceiling after which the deployment is permanently deleted.
Why the distractors are wrong:
- B (maximum lease of 7 days) would let deployments run for 7 days from the start, not 5, which doesn't align with the testing window requirement.
- D (total maximum lease of 5 days) would cap the total lifetime at 5 days, leaving no room for the 2-day extension.
- E (grace period of 5 days) is a different concept - a grace period is a buffer after lease expiration before deletion occurs, not a control over the lease duration itself.
Memory tip: Think of it as a two-layer ceiling. The maximum lease = the initial grant (5 days = the testing window). The total maximum lease = initial + all extensions combined (5 + 2 = 7 days). Whenever you see a base period plus an extension, you need both controls.
Topics
Community Discussion
No community discussion yet for this question.