Question
Which of the listed requirements would be classified as a recoverability non-functional requirement?
Options
- AThe platform must be integrated with existing change control policies.
- BThe platform must be able to support a maximum tolerable downtime (MTD) of 30 minutes.
- CMaintenance windows must be scheduled to take place monthly during an established overnight
- DThe platform must be available 24 hours a day, 7 days a week with the exception of scheduled