Broadcom-VMware
3V0-21.23 · Question #164
3V0-21.23 Question #164: Real Exam Question with Answer & Explanation
Sign in or unlock 3V0-21.23 to reveal the answer and full explanation for question #164. The question stem and answer options stay visible for context.
Question
An architect is responsible for designing the upgrade of a brownfield vSphere-based solution for a financial services customer. The customer has a requirement to host a mission critical, latency sensitive stock trading application. During initial meetings with the customer, the following information is provided: - The solution is currently running vSphere 7.0 U3 - All vSphere distributed switches (VDS) are at version 7.0.0 - The customer has provisioned new hardware with dedicated AMD Data Processing Units (DPU) - The mission critical applications must not be adversely affected by other workloads running in the environment The architect has made the following design decisions: - The solution will upgrade the existing VMware vCenter Server to version 8.0 - The solution will upgrade all existing VMware ESXi hosts to version 8.0 - The solution will deploy VMware ESXi 8.0 for all new host servers Which three additional design decisions should the architect make to ensure that the new hardware can be used to support the latency-sensitive application? (Choose three.)
Options
- AThe solution will deploy new vSphere distributed switches (7.0.3) and connect the new DPU-
- BThe solution will configure the hosts to use Network Time protocol (NTP).
- CThe solution will deploy all DPU-enabled VMware ESXi hosts into a dedicated VMware vSphere
- DThe solution will configure network offloads compatibility to support DPUs.
- EThe solution will deploy new vSphere distributed switches (8.0.0) and connect the new DPU-
- FThe solution will upgrade all existing vSphere distributed switches to version 8.0.0.
Unlock 3V0-21.23 to see the answer
You've previewed enough free 3V0-21.23 questions. Unlock 3V0-21.23 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.