3V0-21.23 · Question #137
An architect is updating an existing design to include a new vSphere cluster to meet the following customer requirements: - The solution must provide automatic load redistribution of workloads…
The correct answer is A. The solution will enable the Predictive DRS option to avoid host over-commitment. E. The solution will deploy a Distributed Resource Scheduler (DRS) enabled cluster with sufficient F. The solution will deploy a vSphere Distributed Power Management (DPM) enabled cluster with. The solution will enable the Predictive DRS option to avoid host over-commitment. Enabling Predictive DRS will allow the system to proactively adjust resource distribution based on anticipated workload patterns. This helps ensure that workloads are redistributed dynamically to…
Question
An architect is updating an existing design to include a new vSphere cluster to meet the following customer requirements:
- The solution must provide automatic load redistribution of workloads across all resources in the
cluster
- The solution must consider the usage patterns of workloads when performing load redistribution
- The solution must provide capacity to reserve resources equal to two ESXi hosts for failover in
the event of a host failure The architect has also collected the following assumptions and constraints during the design workshops:
A001 - Budget is available for additional hardware and software if required to meet the solution requirements A002 - Capacity is available to allow the deployment of additional tooling to manage the solution C001 - All management workloads must be deployed to the existing vSphere management cluster Which three design decisions should the architect include to meet the documented requirements? (Choose three.)
Options
- AThe solution will enable the Predictive DRS option to avoid host over-commitment.
- BThe solution will enable the Memory Metric for Load Balancing option to avoid host over-
- CThe solution will deploy VMware Aria Operations to monitor the vSphere environment.
- DThe solution will enable the VM Distribution option to avoid host over-commitment.
- EThe solution will deploy a Distributed Resource Scheduler (DRS) enabled cluster with sufficient
- FThe solution will deploy a vSphere Distributed Power Management (DPM) enabled cluster with
How the community answered
(39 responses)- A67% (26)
- B5% (2)
- C8% (3)
- D21% (8)
Explanation
The solution will enable the Predictive DRS option to avoid host over-commitment. Enabling Predictive DRS will allow the system to proactively adjust resource distribution based on anticipated workload patterns. This helps ensure that workloads are redistributed dynamically to avoid over-commitment and ensures better performance, particularly when considering workload The solution will deploy a Distributed Resource Scheduler (DRS) enabled cluster with sufficient capacity to meet the workload demands. DRS (Distributed Resource Scheduler) will be used to automatically redistribute workloads across the cluster resources, ensuring balanced load distribution. It meets the requirement for automatic load redistribution while also considering workload usage patterns. Additionally, DRS will take into account the capacity needed to reserve resources equal to two ESXi hosts for failover in the event of a host failure. The solution will deploy a vSphere Distributed Power Management (DPM) enabled cluster with sufficient capacity to meet the workload demands. vSphere DPM enables the cluster to automatically adjust the number of active hosts based on the workload demands, ensuring efficient resource usage. It helps meet the requirement for ensuring capacity for failover by turning off unneeded hosts and allowing the remaining hosts to handle the
Topics
Community Discussion
No community discussion yet for this question.