A sold JUN 3-month STIR-future should be reported in the gap report as of 22 May:
The correct answer is A. as a given deposit with a term of one month and a taken deposit with a term of four months. See the full explanation below for the reasoning.
Question
A sold JUN 3-month STIR-future should be reported in the gap report as of 22 May:
Options
- Aas a given deposit with a term of one month and a taken deposit with a term of four months
- Bas a taken deposit with a term of one month
- Cas a taken deposit with a term of one month and a given deposit with a term of four months
- Das a given deposit with a term of four months
How the community answered
(31 responses)- A74% (23)
- B16% (5)
- C6% (2)
- D3% (1)