352-001 · Question #760
You have been hired to create a Layer 2 network design solution to allow a company to transition their Spanning tree Protocol to Multiple Spanning Tree The company is currently tunning a network…
The correct answer is C. Both vPC switches must be configured at the same time. switches/C07-572834-00_STDG_NX-OS_vPC_DG.pdf If you make changes to the VLAN-to-instance mapping when vPC is already configured, remember to make changes on both the primary and secondary vPC peers to avoid a Type-1 global inconsistency.
Question
You have been hired to create a Layer 2 network design solution to allow a company to transition their Spanning tree Protocol to Multiple Spanning Tree The company is currently tunning a network core with a vPC switch pair and Rapid PVST+ If the company must avoid downtime in the network core, which step will be included in the design solution?
Options
- AIt is not possible to change the Spanning Tree Protocol at a vPC switch pair without a downtime
- BThe Spanning tree Protocol must be disabled first at both vPC switches before enabling MST, to
- CBoth vPC switches must be configured at the same time
- DWhen Bridge Assurance is disabled, the order of the vPC switch that is configured! first does not
- EThe vPC switch with role "primary" must be configured first
- FThe vPC switch with role "secondary" must be configured first
How the community answered
(35 responses)- A20% (7)
- C63% (22)
- D9% (3)
- E6% (2)
- F3% (1)
Explanation
switches/C07-572834-00_STDG_NX-OS_vPC_DG.pdf If you make changes to the VLAN-to-instance mapping when vPC is already configured, remember to make changes on both the primary and secondary vPC peers to avoid a Type-1 global inconsistency.
Topics
Community Discussion
No community discussion yet for this question.