350-601 · Question #275
350-601 Question #275: Real Exam Question with Answer & Explanation
The correct answer is A: one fabric module at the time. epld_rn_8_4_1a.html#pgfId-321469 "To update all EPLDs sequentially with a single command, use the install all epld command with the module all fan-module all xbar all options. After each module is upgraded, it is power cycled to load the EPLD update."
Question
A network engineer needs to upgrade the EPLDs of the fabric modules for a Cisco MDS director- class switch. In which order are components reloaded during the process?
Options
- Aone fabric module at the time
- Ball fabric modules followed by the entire switching platform
- Call fabric modules in parallel
- Done module and one supervisor at the time
Explanation
epld_rn_8_4_1a.html#pgfId-321469 "To update all EPLDs sequentially with a single command, use the install all epld command with the module all fan-module all xbar all options. After each module is upgraded, it is power cycled to load the EPLD update."
Topics
Community Discussion
No community discussion yet for this question.