Cisco
350-040 · Question #304
What is the function of the Link Reset Protocol within the Link Control Facility?
The correct answer is E. It follows a link timeout or connection error and controls LR and LRR substates. See the full explanation below for the reasoning.
Question
What is the function of the Link Reset Protocol within the Link Control Facility?
Options
- AIt is part of the LIP process.
- BIt is used only for Class 1 connection removal.
- CIt is used to arbitrate on a loop to recover from loss of sync
- DIt follows a Link Failure and controls NOS and LOS substates.
- EIt follows a link timeout or connection error and controls LR and LRR substates.
How the community answered
(64 responses)- A6% (4)
- B3% (2)
- C2% (1)
- D16% (10)
- E73% (47)
Community Discussion
No community discussion yet for this question.