Cisco
350-040 · Question #30
350-040 Question #30: Real Exam Question with Answer & Explanation
Sign in or unlock 350-040 to reveal the answer and full explanation for question #30. The question stem and answer options stay visible for context.
Question
Refer to the exhibit. You have a customer with one switch fabric it is connecting to another switch. Based on this FC analyzer output, which is the principal switch in this two-switch fabric?
Exhibit
Options
- Athe switch that sent the first EFP in the trace
- Bthe switch that sent the second EFP in the trace
- Cthe principal switch is selected earlier in the ISL link init process; the EFP frame is not used
- Dthe principal switch election is identified by the value of the "reason code" within the frame, which
Unlock 350-040 to see the answer
You've previewed enough free 350-040 questions. Unlock 350-040 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.
