Refer to the exhibit. Which two configuration steps are required in ISN for Cisco ACI Multi-Site setup? (Choose two.)
The correct answer is C. Increase ISN MTU to support the maximum MTU that is sent by endpoints D. Configure OSPF between spines and ISN routers. infrastructure/white-paper-c11-739609.html
Multisite
Question
Refer to the exhibit. Which two configuration steps are required in ISN for Cisco ACI Multi-Site setup? (Choose two.)
Exhibit
Options
- AConnect Spine2 to ISN routers.
- BConfigure BIDIR-PIM throughout the ISN
- CIncrease ISN MTU to support the maximum MTU that is sent by endpoints
- DConfigure OSPF between spines and ISN routers
- EEnable IGMPv3 on ISN routers
How the community answered
(30 responses)- A3% (1)
- B7% (2)
- C80% (24)
- E10% (3)
Explanation
infrastructure/white-paper-c11-739609.html
Topics
#ISN configuration#OSPF#MTU#Multi-Site
Community Discussion