An engineer is configuring ACI Multi-Pod between two data centers and must plan the physical cabling in the primary data center. How must the Cisco ACI Multi-Pod topology be connected?
The correct answer is C. Connect spine switch 201 and 202 in pod 1 to ports on a device that is providing IP connectivity. In a Cisco ACI Multi-Pod deployment, the spine switches within a pod should not be directly connected to the spine switches in another pod. Instead, they should be connected to an IPN (Inter- Pod Network) device that provides Layer 3 IP connectivity between the pods. This setup…
Question
An engineer is configuring ACI Multi-Pod between two data centers and must plan the physical cabling in the primary data center. How must the Cisco ACI Multi-Pod topology be connected?
Options
- AConnect spine switch 201 and 202 in pod 1 directly to spine switch 201 and 202 in pod 2.
- BConnect leaf switch 101 and 102 in pod 1 directly to leaf switch 101 and 102 in pod 2.
- CConnect spine switch 201 and 202 in pod 1 to ports on a device that is providing IP connectivity
- DConnect leaf switch 101 and 102 in pod 1 to ports on a device that is providing IP connectivity
How the community answered
(64 responses)- A14% (9)
- B3% (2)
- C75% (48)
- D8% (5)
Explanation
In a Cisco ACI Multi-Pod deployment, the spine switches within a pod should not be directly connected to the spine switches in another pod. Instead, they should be connected to an IPN (Inter- Pod Network) device that provides Layer 3 IP connectivity between the pods. This setup allows for the extension of the ACI fabric across multiple locations while maintaining a single logical fabric. The IPN device can be a router or a switch with Layer 3 capabilities that can handle the necessary routing protocols and encapsulation methods required for Multi-Pod