300-630 · Question #107

300-630 Question #107: Real Exam Question with Answer & Explanation

Sign in or unlock 300-630 to reveal the answer and full explanation for question #107. The question stem and answer options stay visible for context.

Question

An engineer is configuring ACI Multi-Pod between two data centers and must plan the physical cabling in the primary data center. How must the Cisco ACI Multi-Pod topology be connected?

Options

  • AConnect spine switch 201 and 202 in pod 1 directly to spine switch 201 and 202 in pod 2.
  • BConnect leaf switch 101 and 102 in pod 1 directly to leaf switch 101 and 102 in pod 2.
  • CConnect spine switch 201 and 202 in pod 1 to ports on a device that is providing IP connectivity
  • DConnect leaf switch 101 and 102 in pod 1 to ports on a device that is providing IP connectivity