Refer to the exhibit. The scheduled Test job fails to be reconfigured with extra configuration on Cisco 9000 Series Switch. Which action resolves the issue?
The correct answer is A. Stop the job before reconfiguration. See the full explanation below for the reasoning.
Question
Refer to the exhibit. The scheduled Test job fails to be reconfigured with extra configuration on Cisco 9000 Series Switch. Which action resolves the issue?
Exhibits
Options
- AStop the job before reconfiguration.
- BCreate the scheduler configuration again.
- CUse the edit command to modify the job.
- DEdit the job using the change command.
How the community answered
(36 responses)- A75% (27)
- B3% (1)
- C8% (3)
- D14% (5)