Cisco
300-615 · Question #188
300-615 Question #188: Real Exam Question with Answer & Explanation
Sign in or unlock 300-615 to reveal the answer and full explanation for question #188. The question stem and answer options stay visible for context.
Question
Refer to the exhibit. An engineer is implementing Fibre Channel (FC) switching on a Cisco 9000 Series Switch, but the procedure fails with the message "FC traffic is not being routed through the fabric". Which action resolves the issue?
Exhibit
Options
- AConfigure the FSPF for VSAN 10 on the NX9k-01-LAB switch.
- BSet the FSPF interface link cost to be less than 30,000 in the IVR path.
- CSet the FSPF hello interval on fc12 interface the NX9k-01-LAB switch.
- DConfigure the VSAN ID 10 on the link connected to fc1/12.
Unlock 300-615 to see the answer
You've previewed enough free 300-615 questions. Unlock 300-615 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.
