Cisco
300-615 · Question #135
Refer to the exhibit. A client configures an upgrade of its Cisco Nexus switches that are connected to the Cisco ACI controller, such that the switches are upgraded one at a time. After the upgrade…
The correct answer is C. Select the "Graceful Maintenance" checkbox D. Place each leaf switch in a different upgrade group. See the full explanation below for the reasoning.
Question
Refer to the exhibit. A client configures an upgrade of its Cisco Nexus switches that are connected to the Cisco ACI controller, such that the switches are upgraded one at a time. After the upgrade is run, it is discovered that both Cisco Nexus switches were upgraded simultaneously. Which two actions ensure that the switches upgrade one at a time? (Choose two.)
Exhibits
Options
- AConfigure the "Do not pause on failure and do not wait on cluster health" Run Mode
- BChoose the "Pause upon upgrade failure" Run Mode
- CSelect the "Graceful Maintenance" checkbox
- DPlace each leaf switch in a different upgrade group
- ECheck the "Ignore Compatibility" checkbox
How the community answered
(25 responses)- A4% (1)
- B4% (1)
- C80% (20)
- E12% (3)
Community Discussion
No community discussion yet for this question.

