Question

Refer to the exhibit. A client configures an upgrade of its Cisco Nexus switches that are connected to the Cisco ACI controller, such that the switches are upgraded one at a time. After the upgrade is run, it is discovered that both Cisco Nexus switches were upgraded simultaneously. Which two actions ensure that the switches upgrade one at a time? (Choose two.)

Exhibit

300-615 question #135 exhibit

Options

  • AConfigure the "Do not pause on failure and do not wait on cluster health" Run Mode
  • BChoose the "Pause upon upgrade failure" Run Mode
  • CSelect the "Graceful Maintenance" checkbox
  • DPlace each leaf switch in a different upgrade group
  • ECheck the "Ignore Compatibility" checkbox

Unlock 300-615 to see the answer