Question
An engineer must ensure that all VXLAN and VTEP processes are kept on purpose-built hardware to ensure that all overlay functions are as fast as possible. In which solution is all VXLAN and VTEP decision making moved to the hardware, versus potentially slower software control?
Options
- ALayer 3
- BACI
- CNSX
- DLayer 2
How the community answered
(20 responses)- A75% (15)
- B5% (1)
- C15% (3)
- D5% (1)