nerdexam
Cisco

300-460 · Question #106

300-460 Question #106: Real Exam Question with Answer & Explanation

Sign in or unlock 300-460 to reveal the answer and full explanation for question #106. The question stem and answer options stay visible for context.

Question

An FCoE frame has just arrived on a Cisco Nexus 5000 Series Switch and must be switched toward a directlyattached FCoE storage array. Which two actions must be done to the frame to accomplish this task? (Choose two.)

Options

  • AThe frame is switched out of a physical Fibre Channel interface.
  • BThe frame is switched out of a physical Ethernet interface.
  • CThe frame is switched out of a logical Ethernet interface.
  • DThe frame is switched out of a logical Fibre Channel interface.
  • EThe frame encapsulates a UDP/IP packet.
  • FThe frame encapsulates a TCP/IP packet.

Unlock 300-460 to see the answer

You've previewed enough free 300-460 questions. Unlock 300-460 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full 300-460 Practice