Cisco
300-460 · Question #106
300-460 Question #106: Real Exam Question with Answer & Explanation
Sign in or unlock 300-460 to reveal the answer and full explanation for question #106. The question stem and answer options stay visible for context.
Question
An FCoE frame has just arrived on a Cisco Nexus 5000 Series Switch and must be switched toward a directlyattached FCoE storage array. Which two actions must be done to the frame to accomplish this task? (Choose two.)
Options
- AThe frame is switched out of a physical Fibre Channel interface.
- BThe frame is switched out of a physical Ethernet interface.
- CThe frame is switched out of a logical Ethernet interface.
- DThe frame is switched out of a logical Fibre Channel interface.
- EThe frame encapsulates a UDP/IP packet.
- FThe frame encapsulates a TCP/IP packet.
Unlock 300-460 to see the answer
You've previewed enough free 300-460 questions. Unlock 300-460 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.