nerdexam
Cisco

300-425 · Question #72

A network engineer is preparing for an office site survey with a height of 2.5 meters. Which three components are recommended to complete the survey? (Choose three.)

The correct answer is A. Use a battery pack to power APs - This allows for mobility and testing in various locations B. Use a drawing of the office space to draw AP and client placements. F. Use APs with built-in antennas - They are commonly used for site surveys as they represent. For an effective office site survey, it's recommended to: without relying on fixed power sources. B. Use a drawing of the office space to mark AP and client placements - This helps in planning the optimal locations for AP installation. the typical deployment scenario…

Wireless Site Survey

Question

A network engineer is preparing for an office site survey with a height of 2.5 meters. Which three components are recommended to complete the survey? (Choose three.)

Options

  • AUse a battery pack to power APs - This allows for mobility and testing in various locations
  • BUse a drawing of the office space to draw AP and client placements.
  • CUse DoS attack on APs while measuring the throughput.
  • DUse APs with directional antennas.
  • EUse APs with external antennas.
  • FUse APs with built-in antennas - They are commonly used for site surveys as they represent

How the community answered

(41 responses)
  • A
    93% (38)
  • C
    2% (1)
  • D
    5% (2)

Explanation

For an effective office site survey, it's recommended to: without relying on fixed power sources. B. Use a drawing of the office space to mark AP and client placements - This helps in planning the optimal locations for AP installation. the typical deployment scenario. n_and_Planning.html#ID3405

Topics

#site survey components#AP placement#battery pack#built-in antennas

Community Discussion

No community discussion yet for this question.

Full 300-425 Practice