nerdexam
Exams300-425Questions#256
Cisco

300-425 · Question #256

300-425 Question #256: Real Exam Question with Answer & Explanation

Sign in or unlock 300-425 to reveal the answer and full explanation for question #256. The question stem and answer options stay visible for context.

Question

A customer is transitioning the wireless network from a legacy Cisco AirOS-based WLC to a new Cisco IOS XE-based WLC that includes next generation APs. During the transition, the two systems must coexist while the APs are being migrated. The customer requires that users connected to either system maintain their IP address and security posture when roaming between APs on the same controller and different controllers. Which design approach must the engineer take for the legacy and next-generation WLCs?

Options

  • AUse high availability in an Active/Active state cluster pair between the two WLCs.
  • BUse a mobility tunnel that supports control channel encryption between the two WLCs.
  • CUse a mobility tunnel that supports data channel encryption between the two WLCs.
  • DUse high availability in an Active/Active N+1 state cluster pair between the two WLCs.

Unlock 300-425 to see the answer

You've previewed enough free 300-425 questions. Unlock 300-425 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full 300-425 Practice