An engineer must design AP placements for a new branch office that contains two floors. The engineer uses Ekahau to complete the predictive survey. To calculate the signal bleed through between…

The correct answer is C. Add alignment points. In a multi-floor Ekahau predictive survey, alignment points must be added to correlate identical physical locations across floors so the tool can accurately calculate inter-floor signal bleed.

Wireless Site Survey

Question

An engineer must design AP placements for a new branch office that contains two floors. The engineer uses Ekahau to complete the predictive survey. To calculate the signal bleed through between floors, the engineer creates a building, adds the floors, and attenuations areas. After the scale is set, what else must be added on the floors to accurately measure the signal bleed at a specific location?

Options

  • AChoose the access point models.
  • BStart the auto planner.
  • CAdd alignment points.
  • DDraw in coverage areas.

How the community answered

(13 responses)
  • A
    8% (1)
  • B
    15% (2)
  • C
    77% (10)

Why each option

In a multi-floor Ekahau predictive survey, alignment points must be added to correlate identical physical locations across floors so the tool can accurately calculate inter-floor signal bleed.

AChoose the access point models.

Choosing AP models is necessary to simulate signal propagation but does not establish the spatial floor-to-floor reference needed to measure bleed at a precise vertical location.

BStart the auto planner.

The auto planner suggests AP placements automatically but does not contribute to the floor alignment geometry required for inter-floor signal bleed calculations.

CAdd alignment points.Correct

Alignment points are reference markers placed on each floor plan that link the same physical location across multiple floor images, giving Ekahau the spatial relationship it needs to model vertical RF propagation between floors. Without them, the software cannot determine how the floors are stacked relative to each other, making inter-floor bleed simulations unreliable. After scale is set, adding alignment points is the required next step before the tool can accurately predict signal strength at a specific location on adjacent floors.

DDraw in coverage areas.

Drawing coverage areas defines desired coverage zones for planning purposes but does not create the physical positional linkage between floors needed for bleed analysis.

Concept tested: Ekahau multi-floor alignment points for inter-floor bleed

Source: https://support.ekahau.com/hc/en-us