nerdexam
Cisco

300-415 · Question #249

Refer to the exhibit. Cisco SD-WAN is deployed with controllers hosted in a data center. All branches have WAN Edge devices with dual connections to the data center, one via internet and the other usi

Sign in or unlock 300-415 to reveal the answer and full explanation for question #249. The question stem and answer options stay visible for context.

WAN Edge Router Deployment

Question

Refer to the exhibit. Cisco SD-WAN is deployed with controllers hosted in a data center. All branches have WAN Edge devices with dual connections to the data center, one via internet and the other using MPLS. Three branches out of 20 have issues with their control connections on MPLS circuit. The local error refers to Control Connection Failure. Which action resolves the issue?

Options

  • AUpdate the system IP on vManage and then resend it to the controllers.
  • BRectify issues with the underlay routing configuration.
  • CMatch the TLOC color on the controllers and all WAN Edge devices.
  • DMath certificates for the DTLS connection and Root CA must be installed first on WAN Edge devices.

Unlock 300-415 to see the answer

You've previewed enough free 300-415 questions. Unlock 300-415 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Topics

#SD-WAN Control Plane#Troubleshooting#Underlay Network#MPLS
Full 300-415 Practice