When should a Layer I site survey be performed?

The correct answer is C. for an extended period of time during the predeployment site survey and during the post-deployment site. A Layer 1 site survey uses a spectrum analyzer to detect non-802.11 RF interference sources such as microwave ovens, Bluetooth devices, cordless phones, and radar. It must be performed for an extended period of time-not briefly-because many interference sources are intermittent…

Wireless Troubleshooting

Question

When should a Layer I site survey be performed?

Options

  • Abriefly during the predictive site survey
  • Bbriefly during the passive site survey
  • Cfor an extended period of time during the predeployment site survey and during the post-deployment site
  • Dfor an extended period of time during the predeployment site survey only

How the community answered

(25 responses)
  • B
    4% (1)
  • C
    92% (23)
  • D
    4% (1)

Explanation

A Layer 1 site survey uses a spectrum analyzer to detect non-802.11 RF interference sources such as microwave ovens, Bluetooth devices, cordless phones, and radar. It must be performed for an extended period of time-not briefly-because many interference sources are intermittent and may only appear during specific hours (e.g., lunch breaks, shift changes, or scheduled equipment use). It should be conducted both during the pre-deployment phase (to identify existing interference before designing the network) and during the post-deployment phase (to confirm the deployed network is not affected by new or previously undetected interference). Performing it only briefly or only during passive/predictive surveys would miss transient interference sources and provide an incomplete picture of the RF environment.

Topics

#Layer 1 survey#spectrum analysis#predeployment survey#site survey methodology