300-360 · Question #136
When should a Layer I site survey be performed?
The correct answer is C. for an extended period of time during the predeployment site survey and during the post-deployment site. A Layer 1 site survey uses a spectrum analyzer to detect non-802.11 RF interference sources such as microwave ovens, Bluetooth devices, cordless phones, and radar. It must be performed for an extended period of time-not briefly-because many interference sources are intermittent…
Question
When should a Layer I site survey be performed?
Options
- Abriefly during the predictive site survey
- Bbriefly during the passive site survey
- Cfor an extended period of time during the predeployment site survey and during the post-deployment site
- Dfor an extended period of time during the predeployment site survey only
How the community answered
(25 responses)- B4% (1)
- C92% (23)
- D4% (1)
Explanation
A Layer 1 site survey uses a spectrum analyzer to detect non-802.11 RF interference sources such as microwave ovens, Bluetooth devices, cordless phones, and radar. It must be performed for an extended period of time-not briefly-because many interference sources are intermittent and may only appear during specific hours (e.g., lunch breaks, shift changes, or scheduled equipment use). It should be conducted both during the pre-deployment phase (to identify existing interference before designing the network) and during the post-deployment phase (to confirm the deployed network is not affected by new or previously undetected interference). Performing it only briefly or only during passive/predictive surveys would miss transient interference sources and provide an incomplete picture of the RF environment.
Topics
Community Discussion
No community discussion yet for this question.