nerdexam
Broadcom-VMware

2V0-622 · Question #83

An administrator wants to upgrade to vCenter Server 6.x. The vCenter Server: -Is hosted on a virtual machine server running Microsoft Windows Server 2008 R2, with 8 vCPUs and 16GB RAM. -Will have an…

The correct answer is B. The virtual machine has insufficient resources for the environment size. A vCenter Server 6.x Large Environment configuration requires at least 16 vCPUs and 32 GB RAM, so the described server with only 8 vCPUs and 16 GB RAM does not meet the minimum hardware requirements.

Section 4 – Upgrade vSphere 6.x to vSphere 6.5

Question

An administrator wants to upgrade to vCenter Server 6.x. The vCenter Server:

-Is hosted on a virtual machine server running Microsoft Windows Server 2008 R2, with 8 vCPUs and 16GB RAM. -Will have an embedded Platform Services Controller. -Hosts a Large Environment with 1,000 ESXi hosts and 10,000 Virtual Machines. Why does the vCenter Server not meet the minimum requirements?

Options

  • AWindows Server 2008 R2 is not a supported Operating System for vCenter Server.
  • BThe virtual machine has insufficient resources for the environment size.
  • CThe environment is too large to be managed by a single vCenter Server.
  • DThe Platform Services Controller must be changed to an External deployment.

How the community answered

(26 responses)
  • A
    8% (2)
  • B
    73% (19)
  • C
    4% (1)
  • D
    15% (4)

Why each option

A vCenter Server 6.x Large Environment configuration requires at least 16 vCPUs and 32 GB RAM, so the described server with only 8 vCPUs and 16 GB RAM does not meet the minimum hardware requirements.

AWindows Server 2008 R2 is not a supported Operating System for vCenter Server.

Windows Server 2008 R2 (64-bit) is a supported host operating system for vCenter Server 6.x, so the OS selection does not disqualify this deployment.

BThe virtual machine has insufficient resources for the environment size.Correct

VMware publishes tiered hardware requirements for vCenter 6.x based on environment size - a Large Environment deployment with an embedded PSC requires a minimum of 16 vCPUs and 32 GB RAM, and the described VM provides only half of each required resource, making it non-compliant.

CThe environment is too large to be managed by a single vCenter Server.

A single vCenter Server 6.x instance is fully supported for managing up to 1,000 ESXi hosts and 10,000 VMs in a Large Environment configuration, so scale alone is not the disqualifying factor.

DThe Platform Services Controller must be changed to an External deployment.

An embedded Platform Services Controller is a valid and supported topology for vCenter 6.x including Large Environment deployments, so the PSC deployment model is not the problem.

Concept tested: vCenter Server 6.x minimum hardware requirements by environment size

Source: https://docs.vmware.com/en/VMware-vSphere/6.0/com.vmware.vsphere.install.doc/GUID-752FCA83-1A9B-499E-9C65-D5625351C0B5.html

Topics

#vCenter Server upgrade#minimum requirements#Large Environment#embedded PSC

Community Discussion

No community discussion yet for this question.

Full 2V0-622 Practice