nerdexam
Broadcom-VMware

2V0-602 · Question #305

A VMware vSphere 6.x Administrator has been tasked with enabling the Integrated Load Balancer for the new vRealize Log Insight cluster. What three options are required before the Integrated Load…

The correct answer is A. The time on the vRealize Log Insight virtual appliance must be synchronized with an NTP C. The vRealize Log Insight master and work nodes must have CA signed certificates. D. Verify that all vRealize Log Insight nodes and the specified Integrated Load Balancer IP. insight.administration.doc%2FGUID-72CB469A-F276-438D-BC93-77853E2CC0B9.html

Section 5 – Administer and Maintain vSphere

Question

A VMware vSphere 6.x Administrator has been tasked with enabling the Integrated Load Balancer for the new vRealize Log Insight cluster. What three options are required before the Integrated Load Balancer can be used? (Choose three.)

Options

  • AThe time on the vRealize Log Insight virtual appliance must be synchronized with an NTP
  • BAll vRealize Log Insight nodes are configured as the same size.
  • CThe vRealize Log Insight master and work nodes must have CA signed certificates.
  • DVerify that all vRealize Log Insight nodes and the specified Integrated Load Balancer IP
  • EThe vRealize Log Insight master and worker nodes must have the same certificates.

How the community answered

(24 responses)
  • A
    75% (18)
  • B
    8% (2)
  • E
    17% (4)

Explanation

insight.administration.doc%2FGUID-72CB469A-F276-438D-BC93-77853E2CC0B9.html

Topics

#vRealize Log Insight#integrated load balancer#NTP synchronization#SSL certificates

Community Discussion

No community discussion yet for this question.

Full 2V0-602 Practice