2V0-17.25 · Question #96
An administrator is tasked with creating a workload domain using Fibre Channel as the principal storage type. Which of the following prerequisites must be verified and prepared before the workload…
The correct answer is D. Ensure the storage Logical Unit Number (LUNs) are presented to all ESX hosts. When using Fibre Channel as the principal storage type, the required prerequisite is that the storage Logical Unit Numbers are properly presented and visible to all ESXi hosts so that VMware Cloud Foundation can detect, validate, and use the shared FC storage during workload…
Question
An administrator is tasked with creating a workload domain using Fibre Channel as the principal storage type. Which of the following prerequisites must be verified and prepared before the workload domain creation process can start?
Options
- AConfigure port binding on all ESX hosts.
- BConfigure a VMkernel interface for storage access to all ESX hosts.
- CEnsure eligible and supported SSD disks are installed in all ESX hosts.
- DEnsure the storage Logical Unit Number (LUNs) are presented to all ESX hosts.
How the community answered
(22 responses)- A9% (2)
- B5% (1)
- C18% (4)
- D68% (15)
Explanation
When using Fibre Channel as the principal storage type, the required prerequisite is that the storage Logical Unit Numbers are properly presented and visible to all ESXi hosts so that VMware Cloud Foundation can detect, validate, and use the shared FC storage during workload domain creation.