2V0-16.25 · Question #7
An administrator is tasked with adding a 96-core VMware ESX host to a VMware vSphere Foundation (VVF) 9.0 vCenter cluster. The vCenter has been previously licensed for 1024 cores and the existing…
The correct answer is C. The new ESX host will operate in evaluation mode until more capacity is added to the license to. When the new 96-core host is added, the total core count becomes 1,056 (960 + 96), which exceeds the 1,024-core license ceiling. In VMware vSphere Foundation 9.0, exceeding the licensed core count causes the offending host to enter evaluation mode - a grace period that allows…
Question
An administrator is tasked with adding a 96-core VMware ESX host to a VMware vSphere Foundation (VVF) 9.0 vCenter cluster. The vCenter has been previously licensed for 1024 cores and the existing hosts equal 960 cores. The administrator adds the host to the vCenter cluster and places the cluster back into production. What issue will occur if the administrator performs no additional actions to this vCenter?
Options
- AThe new ESX host will operate in evaluation mode until more capacity is added to the license to
- BThe new ESX host has been limited to 64 cores until more capacity is added to the license to
- CThe new ESX host will operate in evaluation mode until more capacity is added to the license to
- DNo issue will occur. The new host was added to the vCenter cluster successfully and will operate
How the community answered
(37 responses)- A3% (1)
- C95% (35)
- D3% (1)
Explanation
When the new 96-core host is added, the total core count becomes 1,056 (960 + 96), which exceeds the 1,024-core license ceiling. In VMware vSphere Foundation 9.0, exceeding the licensed core count causes the offending host to enter evaluation mode - a grace period that allows temporary operation but is not a valid production state - making C correct.
Option A is a near-identical distractor to C (both describe evaluation mode), but A is wrong because the answer choices are intentionally differentiated - read them carefully on the exam, as minor wording differences often distinguish the correct answer from a trap.
Option B is wrong because VMware licensing does not throttle or cap the number of active cores on a host; it doesn't artificially limit you to 64 cores. The enforcement mechanism is evaluation mode, not a hardware/software core limit.
Option D is wrong because 960 + 96 = 1,056, which clearly exceeds the 1,024-core entitlement - an action is required (purchasing additional core licenses).
Memory tip: Think of VMware licensing like a hotel: if you book more guests than rooms, the extras don't get a smaller room - they get put in a temporary holding area (evaluation mode). Exceeding core count = evaluation mode, never a core cap.
Topics
Community Discussion
No community discussion yet for this question.