nerdexam
Broadcom-VMware

2V0-13.25 · Question #23

2V0-13.25 Question #23: Real Exam Question with Answer & Explanation

Sign in or unlock 2V0-13.25 to reveal the answer and full explanation for question #23. The question stem and answer options stay visible for context.

Question

A customer is designing a multi-site VMware Cloud Foundation (VCF) and vSAN Data Protection (DP) architecture to ensure business continuity. The customer's support team must validate the failover and recovery processes before being allowed to deploy into production. Which two validation activities should be included in the strategy to meet the objective? (Choose two.)

Options

  • AConduct recovery plan testing annually, as frequent testing may introduce instability in DR
  • BAssess the impact of failover scenarios ?Ensures application dependencies, such as inter-site
  • C(generic plans) reduces workload alignment; VMware requires application-aware recovery
  • DPlanned and unplanned failover tests ?VMware best practices emphasize testing both
  • E(vSphere HA/DRS) does not replace site-level recovery orchestration and validation - HA/DRS

Unlock 2V0-13.25 to see the answer

You've previewed enough free 2V0-13.25 questions. Unlock 2V0-13.25 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full 2V0-13.25 Practice