nerdexam
Broadcom-VMware

2V0-11.25 · Question #134

An administrator needs to scale an NSX Edge cluster by adding additional Edge nodes. Which three steps must be taken before scaling an Edge cluster from SDDC Manager? (Choose three.)

The correct answer is A. Assign a unique management IP for each Edge node. B. Assign two Tunnel Endpoint (TEP) addresses for each Edge node. D. Verify DNS records have been added for each new Edge node. A: Each new Edge node must have its own unique management IP address for proper identification and network communication. B: Two TEP addresses are needed for overlay network connectivity to ensure redundancy and optimal traffic flow. D: Proper DNS records must exist for…

Section 2 - Manage VCF Networking

Question

An administrator needs to scale an NSX Edge cluster by adding additional Edge nodes. Which three steps must be taken before scaling an Edge cluster from SDDC Manager? (Choose three.)

Options

  • AAssign a unique management IP for each Edge node.
  • BAssign two Tunnel Endpoint (TEP) addresses for each Edge node.
  • CAdd an additional NSX VDS uplink for each Edge node being added.
  • DVerify DNS records have been added for each new Edge node.
  • EPlace the Edge cluster in maintenance mode prior to expanding.

How the community answered

(27 responses)
  • A
    70% (19)
  • C
    19% (5)
  • E
    11% (3)

Explanation

A: Each new Edge node must have its own unique management IP address for proper identification and network communication. B: Two TEP addresses are needed for overlay network connectivity to ensure redundancy and optimal traffic flow. D: Proper DNS records must exist for management and operational connectivity, as DNS resolution is critical for Edge node communication and cluster integration.

Topics

#NSX Edge cluster#Edge node scaling#TEP addresses#DNS prerequisites

Community Discussion

No community discussion yet for this question.

Full 2V0-11.25 Practice