You are planning a relayout for a 10GB RAID-5 volume with a RAID-5 log to a stripe-mirror configuration. Dirty-region logging is indicated by the volume's size. How would your plan to address the…
The correct answer is B. The RAID-5 log should be removed prior to the relayout and after the relayout completes, the. See the full explanation below for the reasoning.
Question
You are planning a relayout for a 10GB RAID-5 volume with a RAID-5 log to a stripe-mirror configuration. Dirty-region logging is indicated by the volume's size. How would your plan to address the logs?
Options
- ARemove the RAID-5 log and create a DRL prior to the relayout operation.
- BThe RAID-5 log should be removed prior to the relayout and after the relayout completes, the
- CRelayout will remove log plexes from the volume, but the DRL must be created after relayout is
- DUse the "convertlogs" option of vxassist to cause the relayout job to convert the log plexes.
How the community answered
(32 responses)- A3% (1)
- B78% (25)
- C6% (2)
- D13% (4)