Symantec
250-315 · Question #233
250-315 Question #233: Real Exam Question with Answer & Explanation
Sign in or unlock 250-315 to reveal the answer and full explanation for question #233. The question stem and answer options stay visible for context.
Question
A company suffered a catastrophic hardware failure on the Symantec Endpoint Protection Manager (SEPM) which was using a remote Microsoft SQL Server. The administrator has all required backups. The administrator restores the hardware and the operating system with the required software (including SEPM). What is the next step in the recovery procedure?
Options
- AExport the server certificate from the SEPM console.
- BCustomize the SEPM configuration using the recovery file.
- CRestore the SQL database to realign with SEPM restore.
- DReplace the Sylink.xml using the SylinkDrop.exe.
Unlock 250-315 to see the answer
You've previewed enough free 250-315 questions. Unlock 250-315 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.