1Z0-543 · Question #44
Which two statements are true about the harvesting step to leverage AIA 11g R1 lifecycle capability?
The correct answer is C. It is necessary to leverage the lifecycle capabilities, such as auto-generate Bill of- D. It is necessary to leverage the lifecycle capabilities, such as facilitating the generation of. Explanation: Once you have unit-tested, source-controlled, and completed your composite implementation, you can harvest these design-time composites into the Project Lifecycle Workspace and, optionally, Oracle Enterprise Repository. When you choose to harvest into the Project…
Question
Which two statements are true about the harvesting step to leverage AIA 11g R1 lifecycle capability?
Options
- AIt is necessary to leverage the lifecycle capabilities, such as functional decomposing.
- BIt is necessary to sanity check your implementation.
- CIt is necessary to leverage the lifecycle capabilities, such as auto-generate Bill of-
- DIt is necessary to leverage the lifecycle capabilities, such as facilitating the generation of
How the community answered
(27 responses)- A7% (2)
- B19% (5)
- C74% (20)
Explanation
Explanation: Once you have unit-tested, source-controlled, and completed your composite implementation, you can harvest these design-time composites into the Project Lifecycle Workspace and, optionally, Oracle Enterprise Repository. When you choose to harvest into the Project Lifecycle Workbench, annotations in composite XML files are published to Project Lifecycle Workbench. These annotations published to Project Lifecycle Workbench are instrumental in facilitating downstream automation, such as bill of material (BOM) generation(C)and deployment plan generation(D). Annotations and harvesting are required to enable this downstream If downstream automation is not a requirement for you, you may or may not annotate and harvest. When you reach a point in the lifecycle flow at which the result of annotations and harvesting are used, such as BOM and deployment plan generation, you can manually complete the BOM via the Project Lifecycle Workbench UI or manually write your own ANT script to generate a deployment plan. Application Integration Architecture Foundation Pack: Harvesting Design-Time Composites into Project Lifecycle Workbench and Oracle Enterprise Repository
Topics
Community Discussion
No community discussion yet for this question.