Which three statements are true about the SPARC M5-32 server power grid connection?

The correct answer is A. The server is designed to be powered by two utility power grids. B. You must connect three power cords (ACO, AC1, and AC2) to one power grid, and connect the E. With dual-power feed set up, the first set of three power cords connected to the server are usedto. https://docs.oracle.com/cd/E19658-01/820-6175-12/install_pwr_on.html

Cabling and Power-On

Question

Which three statements are true about the SPARC M5-32 server power grid connection?

Options

  • AThe server is designed to be powered by two utility power grids.
  • BYou must connect three power cords (ACO, AC1, and AC2) to one power grid, and connect the
  • COnly 3x power cords need to be connected when operating the server at half load.
  • DAll six power cords must be connected, even if you are using only a single power grid.
  • EWith dual-power feed set up, the first set of three power cords connected to the server are usedto

How the community answered

(43 responses)
  • A
    77% (33)
  • C
    7% (3)
  • D
    16% (7)

Explanation

https://docs.oracle.com/cd/E19658-01/820-6175-12/install_pwr_on.html

Topics

#power grid#dual-power feed#power cord connections#AC redundancy