You have developed a BPEL process with a Switch activity using the BPEL 1.1 specification. As part of the upgrade to SOA 12c, you are redesigning the BPEL process to use the BPEL 2.0 specification…

The correct answer is B. Replace the Switch activity with an If activity. See the full explanation below for the reasoning.

Question

You have developed a BPEL process with a Switch activity using the BPEL 1.1 specification. As part of the upgrade to SOA 12c, you are redesigning the BPEL process to use the BPEL 2.0 specification. Identify the right approach.

Options

  • AReplace the Switch activity with a While activity.
  • BReplace the Switch activity with an If activity.
  • CReplace the Switch activity with a Repeat Until activity.
  • DReplace the Switch activity with a For Each activity.

How the community answered

(48 responses)
  • A
    4% (2)
  • B
    75% (36)
  • C
    13% (6)