Question
When performing the Oracle recommended bonding of NETl/NETZ or NET4/NET5, what other step should be completed in order to ensure connectivity, in case of a network hardware outage?
Options
- AEach link should terminate at a separate switch to provide network redundancy.
- BNET0/NET3 should also be bonded and linked to a separate network.
- CThe MTU should be set to 7000 to improve performance.
- DJumbo Frames should be disabled.
- ESTP should be disabled to prevent routing loops.