Question
You plan to apply a patchset to a RAC database running on a two-node cluster. The cluster has this configuration: - Grid infrastructure release 12.1.0.1.0 RAC database release 12.1.0.1.0 - All software installed on local file systems - The database is deployed on ASM disk groups. Examine this list of possible tasks: Identify the required tasks in the correct order to apply the patchset with the least amount of down time.
Exhibit
Options
- A1, 3, 2, 5 and 8
- B3, 2, 5 and 8
- C1, 2, 3, 5 and 8
- D3, 2, 6 and 8
- E3, 2, 5, 2 and 8
Unlock 1Z0-068 to see the answer
You've previewed enough free 1Z0-068 questions. Unlock 1Z0-068 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.