You plan to apply a patchset to a RAC database running on a two-node cluster. The cluster has this configuration: - Grid infrastructure release 12.1.0.1.0 RAC database release 12.1.0.1.0 - All…

The correct answer is C. 1, 2, 3, 5 and 8. https://docs.oracle.com/cd/B19306_01/rac.102/b28759/softpatch.htm#TDPRC918

Install and Administer Oracle RAC

Question

You plan to apply a patchset to a RAC database running on a two-node cluster. The cluster has this configuration:

  • Grid infrastructure release 12.1.0.1.0 RAC database release

12.1.0.1.0

  • All software installed on local file systems
  • The database is deployed on ASM disk groups.

Examine this list of possible tasks:

Identify the required tasks in the correct order to apply the patchset with the least amount of down time.

Exhibit

1Z0-068 question #85 exhibit

Options

  • A1, 3, 2, 5 and 8
  • B3, 2, 5 and 8
  • C1, 2, 3, 5 and 8
  • D3, 2, 6 and 8
  • E3, 2, 5, 2 and 8

How the community answered

(68 responses)
  • A
    7% (5)
  • B
    3% (2)
  • C
    76% (52)
  • D
    1% (1)
  • E
    12% (8)

Explanation

https://docs.oracle.com/cd/B19306_01/rac.102/b28759/softpatch.htm#TDPRC918

Topics

#patchset#rolling upgrade#RAC patching#task ordering