1Z0-060 · Question #62
1Z0-060 Question #62: Real Exam Question with Answer & Explanation
Sign in or unlock 1Z0-060 to reveal the answer and full explanation for question #62. The question stem and answer options stay visible for context.
Question
You notice that the elapsed time for an important database scheduler Job is unacceptably long. The job belongs to a scheduler job class and window. Which two actions would reduce the job's elapsed time?
Options
- AIncreasing the priority of the job class to which the job belongs
- BIncreasing the job's relative priority within the Job class to which it belongs
- CIncreasing the resource allocation for the consumer group mapped to the scheduler job's job class
- DMoving the job to an existing higher priority scheduler window with the same schedule and duration
- EIncreasing the value of the JOB_QUEUE_PROCESSES parameter
- FIncreasing the priority of the scheduler window to which the job belongs
Unlock 1Z0-060 to see the answer