nerdexam
Oracle

1Z0-054 · Question #51

You are a DBA in ABC Corp. You are working on an online transaction processing (OLTP) system.The applications running on the database use connection pooling to connect to the database to perform…

Sign in or unlock 1Z0-054 to reveal the answer and full explanation for question #51. The question stem and answer options stay visible for context.

Question

You are a DBA in ABC Corp. You are working on an online transaction processing (OLTP) system.The applications running on the database use connection pooling to connect to the database to perform transactions. The company wants to upgrade the CPU and the memory for the machine on which the database is running. To test the realistic workload on the new machine with increased CPU and memory, you identified the peak workload time for the database and captured the workload on the production system. You set up the test machine with the upgraded CPU and memory and installed the database with the same version as production. Which three actions would you perform to accomplish the realistic replay of the peak workload on the test machine? (Choose three.)

Options

  • APreprocess the captured workload for the specified target database version.
  • BSet up as many replay clients as there are actual clients to the production system.
  • CSet up all the replay clients on the same machine on which the test database is running.
  • DResolve all external references such as database links, external tables, and directory objects.
  • ERestore the replay database to match the capture database at the start of the workload capture.

Unlock 1Z0-054 to see the answer

You've previewed enough free 1Z0-054 questions. Unlock 1Z0-054 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full 1Z0-054 Practice