Identify four significant changes when a backup of Exadata compute nodes must be performed.

The correct answer is A. application of operating system patches C. application of Oracle patches D. reconfiguration of significant operating system parameters G. addition of an Exadata storage expansion rack. See the full explanation below for the reasoning.

Question

Identify four significant changes when a backup of Exadata compute nodes must be performed.

Options

  • Aapplication of operating system patches
  • Bbefore shutdown to preserve storage indexes
  • Capplication of Oracle patches
  • Dreconfiguration of significant operating system parameters
  • Einstallation or reconfiguration of significant non-Oracle software
  • Fstorage server rebalancing
  • Gaddition of an Exadata storage expansion rack

How the community answered

(45 responses)
  • A
    71% (32)
  • B
    4% (2)
  • E
    16% (7)
  • F
    9% (4)

Community Discussion