nerdexam
Citrix

1Y1-A25 · Question #62

1Y1-A25 Question #62: Real Exam Question with Answer & Explanation

Sign in or unlock 1Y1-A25 to reveal the answer and full explanation for question #62. The question stem and answer options stay visible for context.

Question

Scenario: XenServer 6.0 was recently rolled out as the hosting infrastructure for Nether Tech XenApp and XenDesktop resources. The company uses physical switches to separate the LAN segment from the DMZ network segment. A web server in the DMZ connects to a Microsoft SQL server on the LAN segment. Nether Tech would like to phase out the physical switches and implement the Distributed Virtual Switch Controller for controlling the security between these networks. Which two steps should the Citrix Engineer take to meet the needs as stated in the scenario? (Choose two.)

Options

  • AOn each XenServer host, import a Distributed Virtual Switch Controller
  • BOn a single XenServer host, import a Distributed Virtual Switch Controller
  • COn the virtual interface card of the Web server allowing traffic over TCP port number 1433, add
  • DOn the physical interface card of the SQL server allowing traffic over TCP port number 1433, add

Unlock 1Y1-A25 to see the answer

You've previewed enough free 1Y1-A25 questions. Unlock 1Y1-A25 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full 1Y1-A25 Practice