1Y0-351 · Question #145
Scenario: A network engineer is managing a NetScaler environment that has two NetScaler devices running as a high availability pair. The engineer must upgrade the current version from NetScaler 9 to…
The correct answer is B. Upgrade the secondary node and then upgrade the primary node. See the full explanation below for the reasoning.
Question
Scenario: A network engineer is managing a NetScaler environment that has two NetScaler devices running as a high availability pair. The engineer must upgrade the current version from NetScaler 9 to NetScaler 10.5. Which action must the engineer take?
Options
- AUpgrade the primary node and perform HA sync.
- BUpgrade the secondary node and then upgrade the primary node.
- CUpgrade the primary node and then upgrade the secondary node.
- DBreak the high availability pair, upgrade each NetScaler device, and then reconfigure high availability.
How the community answered
(41 responses)- A5% (2)
- B83% (34)
- C2% (1)
- D10% (4)