Your customer is replacing a Brocade VDX 6740 (RBridge ID 2) to an existing VCS fabric in logical chassis mode with VCSID 2. They would like to migrate the port configurations to the new switch when…

The correct answer is A. Issue a command to replace RBridge ID 2 with a new WWN of the replacement. D. Issue a command to enable logical chassis mode on the replacement for RBridge ID 2. See the full explanation below for the reasoning.

Question

Your customer is replacing a Brocade VDX 6740 (RBridge ID 2) to an existing VCS fabric in logical chassis mode with VCSID 2. They would like to migrate the port configurations to the new switch when the uplinks are connected. Which two actions are necessary for the replacement? (Choose two.)

Options

  • AIssue a command to replace RBridge ID 2 with a new WWN of the replacement.
  • BIssue a command to default the configuration for RBridge ID 2.
  • CIssue a command to enable VCS Fabric mode with VCSID 2 and RBridge ID 2 on the
  • DIssue a command to enable logical chassis mode on the replacement for RBridge ID 2.

How the community answered

(32 responses)
  • A
    75% (24)
  • B
    9% (3)
  • C
    16% (5)