nerdexam
Brocade

143-420 · Question #185

143-420 Question #185: Real Exam Question with Answer & Explanation

Sign in or unlock 143-420 to reveal the answer and full explanation for question #185. The question stem and answer options stay visible for context.

Question

A customer is attempting to setup a 10 Gbps link between two datacenters. A Brocade DCX 8510-8 fully populated with FC16-48 blades is installed at each datacenter. Which two statements regarding setup requirements are true? (Choose two.)

Options

  • AEach Brocade DCX 8510-8 must have the High Performance Extension over FCIP/FC license installed.
  • BEach Brocade DCX 8510-8 must have the 10 GbE FCIP/10G Fibre Channel license installed.
  • CThe portcfgoctetspeedcombo is required to configure the 10 Gbps speed capabilities.
  • DThe portcfgoctetspeedcombo is not required because each port on a 16 Gbps blade supports both 10

Unlock 143-420 to see the answer

You've previewed enough free 143-420 questions. Unlock 143-420 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full 143-420 Practice