143-420 · Question #185
143-420 Question #185: Real Exam Question with Answer & Explanation
Sign in or unlock 143-420 to reveal the answer and full explanation for question #185. The question stem and answer options stay visible for context.
Question
A customer is attempting to setup a 10 Gbps link between two datacenters. A Brocade DCX 8510-8 fully populated with FC16-48 blades is installed at each datacenter. Which two statements regarding setup requirements are true? (Choose two.)
Options
- AEach Brocade DCX 8510-8 must have the High Performance Extension over FCIP/FC license installed.
- BEach Brocade DCX 8510-8 must have the 10 GbE FCIP/10G Fibre Channel license installed.
- CThe portcfgoctetspeedcombo is required to configure the 10 Gbps speed capabilities.
- DThe portcfgoctetspeedcombo is not required because each port on a 16 Gbps blade supports both 10