Brocade
143-080 · Question #7
Refer to the Exhibit. FC-FC routing is properly configured between Switch 1 and Switch 2. You have configured the EX_Port that will be attached to Switch 3 using a front domain ID of 1 and Fabric ID o
The correct answer is D. FC-FC routing must be enabled on Switch 3. See the full explanation below for the reasoning.
Question
Refer to the Exhibit. FC-FC routing is properly configured between Switch 1 and Switch 2. You have configured the EX_Port that will be attached to Switch 3 using a front domain ID of 1 and Fabric ID of 100. When you connect the cable between Switch 1 and Switch 3, as shown in the Exhibit, the connection segments. What is the cause?
Exhibit
Options
- AThe front Domain ID is set incorrectly
- BThe fabric ID is set incorrectly
- CThe EX_Port is administratively disabled
- DFC-FC routing must be enabled on Switch 3
How the community answered
(25 responses)- A4% (1)
- B12% (3)
- C4% (1)
- D80% (20)
Community Discussion
No community discussion yet for this question.
