nerdexam
IBM

000-221 · Question #6

A physical LPAR has a failed Fibre Channel adapter, which was providing redundant SAN access. What is a prerequisite for using the Replace/Remove task of the PCI Hot Plug Manager?

The correct answer is B. Unconfigure the adapter and child devices. Before using the PCI Hot Plug Manager Replace/Remove task, the adapter and all its child devices must be unconfigured so the operating system releases all references to the hardware.

System Management

Question

A physical LPAR has a failed Fibre Channel adapter, which was providing redundant SAN access. What is a prerequisite for using the Replace/Remove task of the PCI Hot Plug Manager?

Options

  • AVerify HMC RMC connectivity.
  • BUnconfigure the adapter and child devices.
  • CMake sure a spare adapter slot is available.
  • DProvide additional SAN cabling.

How the community answered

(44 responses)
  • A
    9% (4)
  • B
    73% (32)
  • C
    5% (2)
  • D
    14% (6)

Why each option

Before using the PCI Hot Plug Manager Replace/Remove task, the adapter and all its child devices must be unconfigured so the operating system releases all references to the hardware.

AVerify HMC RMC connectivity.

HMC RMC connectivity is a prerequisite for dynamic LPAR partition operations, not specifically for local PCI Hot Plug Replace/Remove tasks.

BUnconfigure the adapter and child devices.Correct

The PCI Hot Plug Manager requires the target adapter to be in a Defined (unconfigured) state before it can safely be removed or replaced. Unconfiguring the adapter and its child devices releases all kernel and driver references, preventing I/O errors or system faults during physical removal. Attempting to remove a configured device without this step can cause data corruption or a system crash.

CMake sure a spare adapter slot is available.

A spare adapter slot is not required to remove a failed adapter; the task only requires that the existing slot and its devices be properly unconfigured.

DProvide additional SAN cabling.

Providing additional SAN cabling relates to restoring redundancy after the replacement is complete, not to the prerequisite steps required before initiating the Remove task.

Concept tested: PCI Hot Plug Manager adapter removal prerequisites in AIX

Source: https://www.ibm.com/docs/en/aix/7.3?topic=hot-plug-management-pci-adapters

Topics

#PCI Hot Plug Manager#Fibre Channel adapter#adapter replacement#unconfigure devices

Community Discussion

No community discussion yet for this question.

Full 000-221 Practice